The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / ETH_2011_MS_V01_M / variable [F1]
enterprise_surveys

Micro-Enterprise Survey 2011

Ethiopia, 2011 - 2012
Get Microdata
Reference ID
ETH_2011_MS_v01_M
DOI
https://doi.org/10.48529/2qtm-2n30
Producer(s)
World Bank
Collection(s)
Enterprise Surveys Fragility, Conflict and Violence
Metadata
DDI/XML JSON
Created on
Dec 07, 2012
Last modified
Apr 11, 2018
Page views
59216
Downloads
30231
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Ethiopiamicro-2011
    data-

Average Length Of Water Shortages (Affecting Production) In Last Fiscal Year (c17)

Data file: Ethiopiamicro-2011 data-

Overview

Valid: 4
Invalid: 146
Type: Discrete
Decimal: 0
Start: 136
End: 137
Width: 2
Range: -9 - 9
Format: Numeric

Questions and instructions

Literal question
How long did these incidents of insufficient water supply last on average?
Categories
Value Category Cases
-9 do not know 1
25%
1 less than one hour 0
0%
4 1
25%
6 1
25%
9 1
25%
Sysmiss 146
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Duration of a water shortage can be estimated by considering the average duration of water insufficiencies that took place in a typical month.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.