The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / NPL_2013_ES_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2013

Nepal, 2013
Get Microdata
Reference ID
NPL_2013_ES_v01_M
DOI
https://doi.org/10.48529/vt8w-9v78
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Created on
Oct 22, 2013
Last modified
Oct 22, 2013
Page views
56389
Downloads
11000
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Nepal-2013-full
    data-
  • Nepal-female-managed-2013

Average Length Of Water Shortages (Affecting Production) In Last Fiscal Year (c17)

Data file: Nepal-2013-full data-

Overview

Valid: 14
Invalid: 468
Type: Discrete
Decimal: 0
Start: 138
End: 139
Width: 2
Range: -9 - 14
Format: Numeric

Questions and instructions

Literal question
How long did these incidents of insufficient water supply last on average?
Categories
Value Category Cases
-9 Don't know 1
7.1%
1 4
28.6%
2 4
28.6%
4 1
7.1%
5 1
7.1%
7 1
7.1%
8 1
7.1%
14 1
7.1%
Sysmiss 468
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Duration of a water shortage can be estimated by considering the average duration of water insufficiencies that took place in a typical month.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.