The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / KAZ_2004_SCPC_V01_M / variable [F1]
central

Survey of Conflict Prevention and Cooperation 2004

Kazakhstan, 2004
Get Microdata
Reference ID
KAZ_2004_SCPC_v01_M
Producer(s)
The Brookings Institution
Metadata
DDI/XML JSON
Created on
Mar 09, 2011
Last modified
Sep 26, 2013
Page views
37561
Downloads
5464
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • database_kaz

(Q21 Primary, 1st). What exactly did you do in these communa (q21p_1)

Data file: database_kaz

Overview

Valid: 216
Valid (weighted): 204.799
Invalid: 1284
Invalid (weighted): 1295.201
Type: Discrete
Decimal: 0
Width: 3
Range: 1 - 40
Format: Numeric
Weighted variable: V395

Questions and instructions

Literal question
What exactly did you do in these communal activities?
Categories
Value Category Cases Weighted
1 Territory`s cleaning 118 112
54.9%
2 Cleaning in entrances of blocks of houses 5 5
2.2%
3 I personally organized collective works 2 1
0.7%
4 Collective works (subbotnic) 33 33
16.2%
5 Planted flowers, bushes, trees 2 2
0.9%
6 Arranged free feasts 1 1
0.5%
7 Painted the fence 1 1
0.3%
8 City Day preparation 1 2
1.1%
9 Cleaned water canals 4 5
2.4%
11 School`s territory cleaning 4 3
1.3%
12 Collected clothes and gave as humanitarian aid 1 1
0.4%
13 Whitening 1 0
0.2%
14 Destroyed houses 1 1
0.4%
15 Streets improvement 17 20
9.7%
17 Deputy electioneering campaign 5 1
0.7%
18 Wrote a letter to the Deputy on transport communication irre 1 0
0.1%
20 The cemetery`s cleaning 1 1
0.7%
21 Organized concerts 1 0
0.2%
23 Put glasses in windows` frames at school 1 1
0.3%
26 Payment and water pump condition control 1 0
0.2%
27 Smoothed down the gravel along the road 2 1
0.6%
28 Picked up garbage 2 1
0.7%
29 School maintenance 2 2
1.1%
31 Cleaned canals 2 2
1%
32 Asphalted the road 1 1
0.3%
33 Streets improvement 1 1
0.6%
34 Organized preparation for the feast 1 1
0.6%
35 Maintenance of the entrance of houses` blocks 1 1
0.6%
37 Planted trees, laid out the park 1 0
0.2%
38 Maintained the roof 1 0
0.2%
40 Installed water pipeline 1 2
0.9%
Sysmiss 1284 1295
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Security
Public
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.