The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / PAK_2013_ES_V01_M / variable [F3]
enterprise_surveys

Enterprise Survey 2013

Pakistan, 2013 - 2014
Get Microdata
Reference ID
PAK_2013_ES_v01_M
DOI
https://doi.org/10.48529/3mw4-mx68
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Created on
Oct 08, 2015
Last modified
Oct 08, 2015
Page views
101277
Downloads
12845
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • pakistan_2013_full_data

In last FY, What Was The Capacity Utilization (%) Of This Establishment? (f1)

Data file: pakistan_2013_full_data

Overview

Valid: 1062
Invalid: 185
Type: Discrete
Decimal: 0
Start: 939
End: 941
Width: 3
Range: -9 - 100
Format: Numeric

Questions and instructions

Literal question
In fiscal year 2011/2012, what was this establishment's output produced as a proportion of the maximum output possible if using all the resources available (capacity utilization)?
Categories
Value Category Cases
-9 DON'T KNOW (SPONTANEOUS) 292
27.5%
1 Capacity utilization 1
0.1%
3 2
0.2%
5 1
0.1%
9 7
0.7%
10 8
0.8%
15 1
0.1%
20 11
1%
23 1
0.1%
25 4
0.4%
30 25
2.4%
35 2
0.2%
40 18
1.7%
45 3
0.3%
47 1
0.1%
50 44
4.1%
55 5
0.5%
56 4
0.4%
58 2
0.2%
59 1
0.1%
60 69
6.5%
62 1
0.1%
64 1
0.1%
65 21
2%
66 3
0.3%
67 1
0.1%
68 5
0.5%
70 99
9.3%
71 1
0.1%
72 2
0.2%
75 33
3.1%
77 1
0.1%
78 2
0.2%
80 101
9.5%
82 5
0.5%
85 38
3.6%
86 2
0.2%
87 2
0.2%
88 2
0.2%
89 1
0.1%
90 57
5.4%
92 4
0.4%
93 1
0.1%
94 1
0.1%
95 17
1.6%
96 1
0.1%
97 1
0.1%
98 1
0.1%
99 7
0.7%
100 149
14%
Sysmiss 185
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
A capacity utilization estimate should be compared to a full production capacity capability.

This question only references the production facility and not the administrative offices.

Full production capacity is the maximum level of production that this establishment could reasonably expect to attain during regular working hours, and under normal and realistic operating conditions fully utilizing the machinery, equipment and employees in place.

Others

Notes
Q99. In fiscal year 2011/2012, what was this establishment’s output produced as a proportion of the maximum output possible if using all the resources available (capacity utilization)?
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.