The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / TZA_2006-2013_ES-P_V01_M / variable [F2]
enterprise_surveys

Enterprise Survey 2006-2013, Panel Data

Tanzania, 2006 - 2014
Get Microdata
Reference ID
TZA_2006-2013_ES-P_v01_M
DOI
https://doi.org/10.48529/rgvk-7f42
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Created on
Oct 08, 2015
Last modified
Oct 08, 2015
Page views
50741
Downloads
54774
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Tanzania_2006_2013_Panel

In last FY, value of losses due to power outages (c9b)

Data file: Tanzania_2006_2013_Panel

Overview

Valid: 575
Invalid: 567
Type: Discrete
Decimal: 0
Start: 179
End: 187
Width: 9
Range: -44 - 444000000
Format: Numeric

Questions and instructions

Literal question
Please estimate the losses that resulted from power outages either as a percentage of total annual sales or as total annual losses.
Annual losses due to power outages
Categories
Value Category Cases
-44 393
68.3%
-9 DK 89
15.5%
0 None 5
0.9%
30 1
0.2%
30000 1
0.2%
60000 1
0.2%
100000 3
0.5%
120000 2
0.3%
150000 1
0.2%
169000 1
0.2%
200000 1
0.2%
250000 3
0.5%
252000 1
0.2%
275000 1
0.2%
300000 2
0.3%
350000 1
0.2%
360000 1
0.2%
456000 1
0.2%
500000 6
1%
600000 3
0.5%
700000 1
0.2%
720000 1
0.2%
980000 1
0.2%
1000000 4
0.7%
1200000 2
0.3%
1440000 1
0.2%
1500000 1
0.2%
1800000 2
0.3%
2000000 5
0.9%
2400000 1
0.2%
2500000 1
0.2%
2648000 1
0.2%
3000000 4
0.7%
3600000 1
0.2%
3840000 1
0.2%
4300600 1
0.2%
4500000 2
0.3%
5000000 3
0.5%
5400000 2
0.3%
6000000 1
0.2%
8000000 1
0.2%
9000000 2
0.3%
9600000 1
0.2%
10000000 1
0.2%
11000000 1
0.2%
12000000 2
0.3%
17040000 1
0.2%
20000000 1
0.2%
30000000 1
0.2%
36000000 1
0.2%
39000000 1
0.2%
40000000 1
0.2%
50000000 1
0.2%
66000000 1
0.2%
86000000 1
0.2%
90000000 1
0.2%
100000000 1
0.2%
130000000 1
0.2%
300000000 1
0.2%
444000000 1
0.2%
Sysmiss 567
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Losses because of power outages: The Manager should estimate the amount of production lost because of power outages.
Question post text
PROVIDE EITHER ONE OR THE OTHER, NOT BOTH c9a or c9b
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.