The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / TZA_2006-2013_ES-P_V01_M / variable [F2]
enterprise_surveys

Enterprise Survey 2006-2013, Panel Data

Tanzania, 2006 - 2014
Get Microdata
Reference ID
TZA_2006-2013_ES-P_v01_M
DOI
https://doi.org/10.48529/rgvk-7f42
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Created on
Oct 08, 2015
Last modified
Oct 08, 2015
Page views
50889
Downloads
54774
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Tanzania_2006_2013_Panel

At current tariff rates and fuel prices, is it more or less (g4u3)

Data file: Tanzania_2006_2013_Panel

Overview

Valid: 419
Invalid: 723
Type: Discrete
Decimal: 0
Start: 1562
End: 1564
Width: 3
Range: -99 - 3
Format: Numeric

Questions and instructions

Literal question
At current tariff rates and fuel prices, is it more or less expensive for you to generate power using your generator rather than to use power from the grid (when available)?
Categories
Value Category Cases
-99 Refused to answer 0
0%
-88 Not provided 0
0%
-77 Not applicable 0
0%
-66 Do not know 0
0%
-44 195
46.5%
1 More expensive to use generator 212
50.6%
2 About the same cost 3
0.7%
3 More expensive to use power from grid 9
2.1%
Sysmiss 723
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.