The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / LSO_2009-2016_ES-P_V01_M / variable [F4]
enterprise_surveys

Enterprise Survey 2009-2016, Panel Data

Lesotho, 2008 - 2016
Get Microdata
Reference ID
LSO_2009-2016_ES-P_v01_M
DOI
https://doi.org/10.48529/6a71-m481
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 11, 2017
Last modified
May 11, 2017
Page views
32793
Downloads
2099
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Lesotho_2009_2016

Applic. To Obtain A Construction-Related Permit Submitted Over The Last 2 Years (g2)

Data file: Lesotho_2009_2016

Overview

Valid: 301
Invalid: 0
Type: Discrete
Decimal: 0
Start: 1326
End: 1327
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
More specifically, over the last two years, did this establishment submit an application to obtain a construction-related permit?
Categories
Value Category Cases
-9 Don't know (spontaneous) 4
1.3%
1 Yes 51
16.9%
2 No 246
81.7%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Application for construction permit. Self-explanatory
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.