The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / LSO_2009-2016_ES-P_V01_M / variable [F4]
enterprise_surveys

Enterprise Survey 2009-2016, Panel Data

Lesotho, 2008 - 2016
Get Microdata
Reference ID
LSO_2009-2016_ES-P_v01_M
DOI
https://doi.org/10.48529/6a71-m481
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 11, 2017
Last modified
May 11, 2017
Page views
32776
Downloads
2099
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Lesotho_2009_2016

Total Annual Expenditure For Purchases Of Land And Buildings In Last Fiscal Yr (n5b)

Data file: Lesotho_2009_2016

Overview

Valid: 43
Invalid: 258
Type: Discrete
Decimal: 0
Start: 1398
End: 1403
Width: 6
Range: -9 - 500000
Format: Numeric

Questions and instructions

Literal question
In fiscal year [insert last complete fiscal year], how much did this establishment spend on purchases of: Land and buildings
Categories
Value Category Cases
-9 Don't know (spontaneous) 4
9.3%
0 31
72.1%
10 1
2.3%
45000 1
2.3%
50000 1
2.3%
60000 1
2.3%
150000 1
2.3%
240000 1
2.3%
350000 1
2.3%
500000 1
2.3%
Sysmiss 258
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
The category machinery, vehicles and equipment is the annual investment of anything used directly by this establishment to produce. Vehicles include transport and loading and unloading vehicles. It should include not only the purchase cost but also all other costs involved in the investment such as transport of the item and installation cost. Computer hardware should be considered under equipment

Land, buildings is the annual investment in land, buildings and structures used directly or indirectly by this establishment to produce goods and services.

Included are expenditures for new and used structures (including those under construction at the end of last complete fiscal year), fixtures and equipment, additions, major alterations and improvements to existing facilities, and capitalized repairs.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.