The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / PRY_2006-2017_ES-P_V01_M / variable [F4]
enterprise_surveys

Enterprise Survey 2006-2010-2017, Panel Data

Paraguay, 2006 - 2017
Get Microdata
Reference ID
PRY_2006-2017_ES-P_v01_M
DOI
https://doi.org/10.48529/hc7h-wq89
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Created on
Mar 06, 2018
Last modified
Mar 06, 2018
Page views
33779
  • Study Description
  • Data Description
  • Get Microdata
  • Data files
  • paraguay_2006_2010_2017

In Last FY, What Was The Capacity Utilization (%) Of This Establishment? (f1)

Data file: paraguay_2006_2010_2017

Overview

Valid: 616
Invalid: 722
Type: Discrete
Decimal: 0
Start: 565
End: 567
Width: 3
Range: -9 - 100
Format: Numeric

Questions and instructions

Literal question
In fiscal year [insert last complete fiscal year], what was this establishment’s output produced as a proportion of the maximum output possible if using all the resources available (capacity utilization)?
Categories
Value Category Cases
-9 Don't know (spontaneous) 14
2.3%
0 3
0.5%
4 1
0.2%
5 3
0.5%
7 2
0.3%
8 1
0.2%
10 9
1.5%
14 1
0.2%
15 2
0.3%
20 13
2.1%
25 8
1.3%
30 23
3.7%
33 2
0.3%
35 6
1%
38 1
0.2%
40 28
4.5%
45 2
0.3%
50 62
10.1%
53 1
0.2%
55 4
0.6%
60 66
10.7%
65 8
1.3%
66 1
0.2%
70 85
13.8%
71 1
0.2%
72 1
0.2%
75 20
3.2%
78 1
0.2%
80 87
14.1%
82 1
0.2%
85 19
3.1%
90 36
5.8%
95 5
0.8%
98 1
0.2%
100 98
15.9%
Sysmiss 722
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
A capacity utilization estimate should be compared to a full production capacity capability. This question only references the production facility and not the administrative offices. Full production capacity is the maximum level of production that this establishment could reasonably expect to attain under normal and realistic operating conditions fully utilizing the machinery, equipment and employees in place
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.