The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / PRY_2006-2017_ES-P_V01_M / variable [F4]
enterprise_surveys

Enterprise Survey 2006-2010-2017, Panel Data

Paraguay, 2006 - 2017
Get Microdata
Reference ID
PRY_2006-2017_ES-P_v01_M
DOI
https://doi.org/10.48529/hc7h-wq89
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Created on
Mar 06, 2018
Last modified
Mar 06, 2018
Page views
37999
  • Study Description
  • Data Description
  • Get Microdata
  • Data files
  • paraguay_2006_2010_2017

Describe Main New/Significantly Improved Process This Establishment Introduced (_2017_h6x)

Data file: paraguay_2006_2010_2017

Overview

Valid: 122
Type: Discrete
Start: 1590
End: 1742
Width: 153
Range: -
Format: character

Questions and instructions

Question pretext
DESCRIPTION SHOULD BE AS DETAILED AS POSSIBLE
Literal question
Please describe in detail the main new or improved process that this establishment introduced during the last three years. The main innovative process is the innovative process that had the largest impact on the operations of the establishment during the last three years.
Categories
Value Category Cases
Aerosol Packaging 1
0.8%
All The Logistics Changed 1
0.8%
Automate The Lines Of Dyes 1
0.8%
Automatic Packaging 1
0.8%
Bar Code 1
0.8%
Better Attention Of Clients Because Of The Registration Of Web Problem 1
0.8%
Billing Improvement Systems 1
0.8%
Blowing Line For Production 1
0.8%
Boat Safety Plan And Evaluation 1
0.8%
Boiler For Larger Steam With Mechanized Fuel Supply 1
0.8%
Book Cover Binder Or Bookbinder 1
0.8%
Bought Several Machines For Improvement Production 1
0.8%
Branch Offices 1
0.8%
Building Processes And Purchasing Systems 1
0.8%
Centralization Of Distribution Center Implementation Of Wms 1
0.8%
Change In Logistics 1
0.8%
Change Of Iso Change In Logistics 1
0.8%
Change Of Logistic System 1
0.8%
Change Of Technology In The Washing Of Bottles And The Installation Of Sandpaper Inside The Plant, Transport Handling For A Better Loyout For Its Quality 1
0.8%
Change Procedure Of Logistics, Change Of Career Plan Procedure Change Of Management System. Customer Service Portal 1
0.8%
Changes In Customer Service 1
0.8%
Changes In Techniques And Procedures In The Quality Of Products 1
0.8%
Computation System 1
0.8%
Construction Of A New Storage Room To Improve Logistics 1
0.8%
Control Of Measurement System 1
0.8%
Control System In The Logistics Of The Company 1
0.8%
Customer Service/Consulting 1
0.8%
Dairy Product Refrigeration Chamber New Silos, Maintenance Of Plant Machinery 1
0.8%
Delivery And Logistics 1
0.8%
Delivery Control And Logistics. Tracking The Deadline Through The Contact With The Client 1
0.8%
Delivery System 1
0.8%
Different Machines For Each Process 1
0.8%
Digital Printing 1
0.8%
Dry Construcction 1
0.8%
Ease Of Comunication 1
0.8%
Engineering Change In Products 1
0.8%
Equipment For The Completion Of Works And Machinery 1
0.8%
Freezing Products Quickly 1
0.8%
Heat Treatment With Own Oven And Quality Certificate 1
0.8%
Hot Stamping Graphic Products 1
0.8%
Ice Machines 1
0.8%
Implementation Of Haccp System 1
0.8%
In The Production Control System 1
0.8%
Incorporates A Mixture Of Raw Material Products 1
0.8%
Infrastructures With New Machinery 1
0.8%
Installations Of High And Low Tension 1
0.8%
Introduction Of New Technology 1
0.8%
Inventary Movement Technologies 1
0.8%
Investment In Processing Machine 1
0.8%
Large Warehouse And New Machinery 1
0.8%
Layout And Design 1
0.8%
Logistic Part 1
0.8%
Logistics And Credit Response Time Promotions New Customer Service Platforms 1
0.8%
Logistics Delivery Method 1
0.8%
Low Vision Department 1
0.8%
Machine For Faster Print Speed And More Colors 1
0.8%
Machinery And Logistic 1
0.8%
Machinery For The Production Process 1
0.8%
Machines Improvement 1
0.8%
Machines Of Last Generation As The Robots Iron Shirts 1
0.8%
Machining Of Work And Packing 1
0.8%
Method Of Sap System 1
0.8%
Mobile Operation System 1
0.8%
Network Utilization For Comunication With Clients 1
0.8%
New Designers And New Methodologies 1
0.8%
New Floor Treatments 1
0.8%
New Logistics Machinery And New Service Methods 1
0.8%
New Process Molds In Processes In All Areas 1
0.8%
New Process, New Machinery 1
0.8%
New Technologies And Attentions With Clients 1
0.8%
New Technologies In Construction And Customer Orders Construction Orders 1
0.8%
New Trucks 1
0.8%
New Trucks For Shipments To The Interior 1
0.8%
Offer Products On The Web 1
0.8%
Online Sales 1
0.8%
Pasteurization Htst System 1
0.8%
Planification System And Management Of Business Resources 1
0.8%
Post Sales Services 1
0.8%
Post Service Sales 1
0.8%
Preparation Of Orders 1
0.8%
Previously, They Were Outsourced And Now Have Their Own Transportation 1
0.8%
Procedures, New Tools And More Control 1
0.8%
Process Of Implementing Systems In Clients 1
0.8%
Processes In The Way Of Working 1
0.8%
Product Distribution 1
0.8%
Product Trasportation Services 1
0.8%
Production And Administrative Teams And Processes 1
0.8%
Production And Corporation Of New Machines With New Processes 1
0.8%
Production Process Food Logistics Delivery 1
0.8%
Products Prepared According To Customer'S Orders 1
0.8%
Quality Controll 1
0.8%
Quality Production Machinery Procedures 1
0.8%
Renovation Of Machineries 1
0.8%
Sales Channel Modification 1
0.8%
Service Indicators And Sales Targets 1
0.8%
Shipment Dispatch And Product Placement In Store 1
0.8%
Speeding Up In The Process Of Receiving Goods 1
0.8%
Standardizations 1
0.8%
Store Renovation 1
0.8%
Supplier Control And Certification 1
0.8%
Technology In Production Machinery 1
0.8%
The Creation Of The Research And Development Department 1
0.8%
The Industrial Assembly Line For Batteries 1
0.8%
The Place Moved In A Strategic Place To Be Closer To Its Customers 1
0.8%
The Technological System 1
0.8%
The Training Of The Employeers 1
0.8%
The Use Of New Tools 1
0.8%
The Use Of Social Media To Communicate With Their Customers 1
0.8%
They Process Their Materials 1
0.8%
Total Computerization Of Services 1
0.8%
Total Modernization Of New Fleet 1
0.8%
Tracking System In Delivery Logistics 1
0.8%
Triple Production Capacity With The Acquisition Of Machines 1
0.8%
Updated Computer System 1
0.8%
Use Of New Machines 1
0.8%
Use Of Social Media 1
0.8%
Use Of The Website, New Communication System With Customers From The Country Side 1
0.8%
We Incorporate Computerized Machines 1
0.8%
Welding And Cutting 1
0.8%
When They Buy 3 Units They Are Graanted 10% Discount 1
0.8%
Work Only On The Basis Of Orders 1
0.8%
Workshop Service 1
0.8%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
H.6 Por favor describa en detalle el principal proceso nuevo o significativamente mejorado que este establecimiento introdujo en los últimos tres años. El principal proceso de innovación, es aquel que tuvo el mayor impacto en las operaciones de este establ
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.