The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / GTM_2017_ES_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2017

Guatemala, 2017 - 2018
Get Microdata
Reference ID
GTM_2017_ES_v01_M
DOI
https://doi.org/10.48529/jw48-1p12
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 07, 2019
Last modified
Jan 07, 2019
Page views
24771
Downloads
894
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • guatemala_2017_full_data

Did You Experience Insufficient Water Supply For Production In Last Fiscal Yr? (c15)

Data file: guatemala_2017_full_data

Overview

Valid: 0
Invalid: 0
Type: Discrete
Decimal: 0
Start: 161
End: 162
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
Over fiscal year 2016, did this establishment experience insufficient water supply for production?
Categories
Value Category
-9 Don't know (spontaneous)
-7 Does not apply
1 Yes
2 No
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Insufficient water supply: whenever there is equipment failure or cessation of production operations due to the lack or reduction of water supply.
Question post text
If 2 -> go to question lac.C18
If -7 -> go to question lac.C19
If -9 -> go to question lac.C18
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.