The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / MOZ_2018_MES_V01_M / variable [F2]
enterprise_surveys

Micro-Enterprise Survey 2018

Mozambique, 2018 - 2019
Get Microdata
Reference ID
MOZ_2018_MES_v01_M
DOI
https://doi.org/10.48529/dqbb-tg07
Producer(s)
World Bank Group (WBG)
Collection(s)
Enterprise Surveys Fragility, Conflict and Violence
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Feb 06, 2020
Last modified
Feb 06, 2020
Page views
47833
Downloads
862
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • mozambiquemicro_2018_full_data.dta
  • mozambiquemicro_2018_full_data.dta

Total Cost of Electricity In A Regular Month (n2b3)

Data file: mozambiquemicro_2018_full_data.dta

Overview

Valid: 11
Invalid: 100
Minimum: -9
Maximum: 8000
Mean: 1862
Standard deviation: 2332.3309799426
Type: Discrete
Decimal: 0
Start: 1251
End: 1254
Width: 4
Range: -9 - 8000
Format: Numeric

Questions and instructions

Literal question
N2B.3. What was the total cost of electricity of this establishment in a regular month, i.e., a month that is neither the busiest nor the slowest of the year?
Categories
Value Category Cases
-9 Don't know (spontaneous) 2
18.2%
400 2
18.2%
750 1
9.1%
1000 1
9.1%
1500 1
9.1%
2500 2
18.2%
3450 1
9.1%
8000 1
9.1%
Sysmiss 100
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.