The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / IMPACT_EVALUATION / RWA_2015-2018_LWHIE_V01_M / variable [F26]
impact_evaluation

Impact, Maintenance, and Sustainability of Irrigation Impact Evaluation Survey 2015-2018, Baseline, First, Second, Third Follow-up

Rwanda, 2015 - 2018
Get Microdata
Reference ID
RWA_2015-2018_LWHIE_v01_M
DOI
https://doi.org/10.48529/899t-y944
Producer(s)
Florence Kondylis, Maria Jones, John Loeser, Jeremy Magruder
Collection(s)
Impact Evaluation Surveys Development Impact Evaluation (DIME)
Metadata
Documentation in PDF DDI/XML JSON
Created on
Feb 27, 2020
Last modified
Mar 03, 2020
Page views
1969236
Downloads
3576
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • bl_hh_modules.dta
  • bl_hh_roster.dta
  • bl_parcel_plot_roster.dta
  • bl_rw_hh_modules.dta
  • bl_rw_hh_roster.dta
  • bl_rw_parcel_plot_roster.dta
  • bl_rw_season_17a.dta
  • bl_rw_season_17b.dta
  • bl_rw_season_17c.dta
  • bl_season_14c.dta
  • bl_season_15a.dta
  • bl_season_15b.dta
  • fup1_hh_modules.dta
  • fup1_hh_roster.dta
  • fup1_parcel_plot_roster.dta
  • fup1_rw_hh_modules.dta
  • fup1_rw_hh_roster.dta
  • fup1_rw_parcel_plot_roster.dta
  • fup1_rw_season_18a.dta
  • fup1_rw_season_18b.dta
  • fup1_rw_season_18c.dta
  • fup1_rw_season_19a.dta
  • fup1_season_16b.dta
  • fup1_season_16c.dta
  • fup1_season_17a.dta
  • fup2_hh_modules.dta
  • fup2_hh_roster.dta
  • fup2_parcel_plot_roster.dta
  • fup2_season_17b.dta
  • fup2_season_17c.dta
  • fup3_hh_modules.dta
  • fup3_hh_roster.dta
  • fup3_parcel_plot_roster.dta
  • fup3_season_18a.dta
  • fup3_season_18b.dta
  • fup3_season_18c.dta
  • fup3_season_19a.dta

What kinds of maintenance does the Irrigation System need? ENUMERATOR: DO NOT PR (ig_11_10)

Data file: fup2_hh_modules.dta

Overview

Valid: 20
Invalid: 1615
Minimum: 10
Maximum: 12
Type: Discrete
Decimal: 0
Start: 1617
End: 1618
Width: 2
Range: 10 - 12
Format: Numeric

Questions and instructions

Categories
Value Category
1 Kuvana ibyondo/ibyatsi mu muyoboro w'ibanze/ (Removal of Silt/Vegetation from the Main Canal)
2 Gusana/gusimbuza inyubako zubakishije isima n'amabuye/ (Repair/Replacement of Masonry)
3 Gusana urukuta rufata ubutaka buri ruguru y'umuroboro w'ibanze/ (Rehabilitation of Embankment along canal)
4 Gusana/gusimbuza agakoresho gafungura amazi ku mpombo ziyamanura/ (Repair/Replacement of secondary valve handles)
5 Gusukura impombo zimanura amazi/ (Secondary Pipe Flushed of Sediment)
6 Gusana uruhavu rujyana amazi mu materasi/ (Rehabilitation of Irrigation Ditch)
7 Gusana ikidamu/ (Repair of Eroded Checkdam)
8 Gusana/gusimbuza agakoresho gafungura amazi kuri robine ivomerera/ (Repair/Replacement of Tertiary Valve handles)
9 Gusibura umuyoboro ujyana amazi mu murima/ (Rehabilitation of Primary Drainage Canal)
10 Gusibura utundi tuyoboro two mu murima/ (Rehabilitation of other drainage canals)
11 Gusana ahandi hangiritse ku mpombo imanura amazi/ (Other Secondary Pipe Damage)
12 Gusana ahafungurirwa amazi ajya mu mpombo/ (Repair of Secondary Valve)
13 Nta na kimwe/ (None)
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.