The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / SIEF / PAK_2012_CEEIE-BL_V01_M / variable [F3]
sief

Community Engagement for Education Impact Evaluation 2012-2013
Baseline Survey

Pakistan, 2012 - 2013
Get Microdata
Reference ID
PAK_2012_CEEIE-BL_v01_M
DOI
https://doi.org/10.48529/hsqw-a637
Producer(s)
Salman Asim
Collection(s)
The Strategic Impact Evaluation Fund (SIEF)
Metadata
Documentation in PDF DDI/XML JSON
Created on
Mar 09, 2023
Last modified
Mar 09, 2023
Page views
205017
Downloads
9256
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • child_questionnaire
  • female_questionnaire
  • head_teacher
  • household_roster
  • household_sample
  • school_observation
  • school_sample
  • smc
  • student
  • teacher
  • tr

Expense1 Name (s08q011)

Data file: head_teacher

Overview

Valid: 278
Invalid: 0
Type: Discrete
Start: 1857
End: 1899
Width: 43
Range: -
Format: character

Questions and instructions

Categories
Value Category Cases
10 BACH 1
0.4%
11022 1
0.4%
1681 1
0.4%
1712 1
0.4%
1862 1
0.4%
1874 1
0.4%
2 FANS 1
0.4%
777 1
0.4%
ACCESSORIES 1
0.4%
ALLMIRAH 1
0.4%
BANCH 1
0.4%
BATH ROOM 1
0.4%
BATHROOM 1
0.4%
BATHROOMS 1
0.4%
BOARD 1
0.4%
BRICKS 1
0.4%
BUIELDING 1
0.4%
BUILDING 1
0.4%
BUILDING MATERAIL 1
0.4%
BULDING CONSTRECTION 1
0.4%
BULDING STRAETUSE 1
0.4%
CEMENT 1
0.4%
CHAIR 1
0.4%
CHAIR DESK REPARING 1
0.4%
CHAIRS 2
0.7%
CHOR DIWARI 1
0.4%
COMPUTER 1
0.4%
DESK 1
0.4%
DESK FROM CLASS 1
0.4%
DESKS 2
0.7%
DOOR PURCHASE 1
0.4%
DOOR REPAIR 1
0.4%
EARTH WORKS 1
0.4%
ELECTRIC ITEMS 1
0.4%
ELECTRIC MOTER 1
0.4%
ELECTRICITY 1
0.4%
FAN 1
0.4%
FERNITURE 2
0.7%
FITTING 1
0.4%
FLOOER 1
0.4%
FUNITURE 1
0.4%
FURNITURE 9
3.2%
FURNITURE REPAIR 1
0.4%
HAND PAMP 1
0.4%
HAND PUMP 7
2.5%
HARD NEAR MATRIAL 1
0.4%
KOLOR 1
0.4%
LATRAIN 1
0.4%
MANTANIRE 1
0.4%
MOTOR HAND 1
0.4%
MOTOR REPAIR 1
0.4%
MOTOR WINDING, MISC. WORKS 1
0.4%
MUD 1
0.4%
NIIL 1
0.4%
NIL 34
12.2%
NILL 45
16.2%
Nil 80
28.8%
Nill 1
0.4%
P11154 1
0.4%
PAINTING COLOUR 1
0.4%
PLAY GROUND 1
0.4%
PRINTS 1
0.4%
Q17054 1
0.4%
READING METIREAL 1
0.4%
REPAI ROF BULIDING 1
0.4%
REPAIR 1
0.4%
REPAIR BOUNDARY WALL 1
0.4%
REPAIR OF CLASS ROOMS 1
0.4%
REPAIR WORKS 1
0.4%
REPAIRING 2
0.7%
REPAIRING AND COLOR OF BUILDING 1
0.4%
REPAIRING AND MAINTAND OF SCHOOL 1
0.4%
REPAIRING ANDMAINTENANCE OF SCHOOL BUILDING 1
0.4%
REPAIRING FOR SCHOOL ROOMS 1
0.4%
REPIR FUNITUER 1
0.4%
REPRAING OF RAIN WATER 1
0.4%
ROOMS 1
0.4%
ROOMS COLOUR REPAIRING 1
0.4%
ROOMS PEPAIR 1
0.4%
ROOTER 1
0.4%
SCHOOL BUILDING REPAIR 1
0.4%
SCHOOL FURNITURE REPAIRING 1
0.4%
SCHOOL MATRIAL 1
0.4%
SCHOOL MURAMAT 1
0.4%
SCHOOL RAPIER 1
0.4%
SCHOOL REPAIRING 1
0.4%
SCHOOL REPARING 1
0.4%
SIGN BOAR 1
0.4%
STATIONARY 2
0.7%
TABLE 2
0.7%
TABLE AND CHAIR 1
0.4%
TABLE CHAIR 2
0.7%
TABLE CHAIRS 1
0.4%
TABLE POSH 1
0.4%
TOILET 1
0.4%
WATER AND FARNICHER REPAIR 1
0.4%
WATER COOLER 3
1.1%
WATER PUMP 1
0.4%
WINDOW 1
0.4%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Description

Definition
Section 8: SMC Expenditures Statement for the Last School Year (April 2010 - March 2011)
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.