The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / JOR_2006_ES_V01_M_WB / variable [F1]
enterprise_surveys

Enterprise Survey 2006

Jordan, 2006
Get Microdata
Reference ID
JOR_2006_ES_v01_M_WB
DOI
https://doi.org/10.48529/z1m8-p072
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
DDI/XML JSON
Created on
May 24, 2011
Last modified
Sep 26, 2013
Page views
27779
Downloads
1414
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Jordan-2006--full
    data-

in 2005, what was the % capacity utilization of this establishment? (f1)

Data file: Jordan-2006--full data-

Overview

Valid: 352
Invalid: 151
Type: Discrete
Decimal: 0
Start: 371
End: 373
Width: 3
Range: -9 - 100
Format: Numeric

Questions and instructions

Question pretext
READ THE FOLLOWING TO THE RESPONDENT BEFORE PROCEEDING: We now turn to the topic of this establishment’s capacity utilization in fiscal year 2005.
Literal question
In fiscal year 2005, what was this establishment's output produced as a proportion of the maximum output possible if using all facilities available (capacity utilization)?
Categories
Value Category Cases
-9 don't know 0
0%
4 1
0.3%
5 1
0.3%
10 3
0.9%
15 1
0.3%
20 5
1.4%
25 1
0.3%
30 11
3.1%
40 13
3.7%
45 3
0.9%
50 24
6.8%
56 1
0.3%
60 29
8.2%
65 6
1.7%
66 2
0.6%
70 52
14.8%
75 8
2.3%
80 49
13.9%
83 1
0.3%
85 6
1.7%
88 1
0.3%
90 28
8%
95 3
0.9%
100 103
29.3%
Sysmiss 151
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
A capacity utilization estimate should be compared to a full production capacity capability.

This question only references the production facility and not the administrative offices.

Full production capacity is the maximum level of production that this establishment could reasonably expect to attain during regular working hours, and under normal and realistic operating conditions fully utilizing the machinery, equipment and employees in place.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.