The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / SIEF / KEN_2015-2019_WASHIE_V01_M
sief

Water and Sanitation Impact Evaluation 2015-2019
Baseline and Endline Survey

Kenya, 2015 - 2019
Get Microdata
Reference ID
KEN_2015-2019_WASHIE_v01_M
DOI
https://doi.org/10.48529/1ma0-aq31
Producer(s)
Aidan Coville, Sebastian Galiani, Paul Gertler
Collection(s)
The Strategic Impact Evaluation Fund (SIEF) Impact Evaluation Surveys
Metadata
Documentation in PDF DDI/XML JSON
Created on
Aug 19, 2025
Last modified
Aug 19, 2025
Page views
30314
Downloads
481
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • property_owner_bl.dta
  • property_owner_end.dta
  • property_owner_outreach.dta
  • tenant_bl.dta
  • tenant_end.dta

Data file: property_owner_bl.dta

Property owner survey baseline dataset

Cases: 2287
Variables: 98

Variables

number_of_compounds
Number of compounds
cmpd_id
Compound ID
survey_type
Survey type
landl_gender
Gender
age
Age
lev_educ
Highest level of education
prim_occup
Primary Occupation
ownership
Sole owner of compound
no_of_coown
Number of co-owners
percent_owned
Ownership share
long_own_years
Time owned this compound: Years
long_own_months
Time owned this compound: Months
acquire
How landlord acquired the compound
purch_full
Amount acquired this compound
paid_full
Compound is paid off fully
balance
Amount owed on mortgage
value_now
Estimated sale price of compound (if had to sell now)
num_storey
Number of stories in main structure
landl_reside
Owner occupied (owner lives there without renting out)
reside_in_cmpd
Months landlord has resided in compound (in last 12 months)
rental_dwell
Compound has rental dwellings
no_of_rent_dwell
Number of rental dwellings in compound
no_of_tenants
Number of paying tenants
tenants
Had paying tenants in this compound last month
tot_rent_num
Monthly rental income (KES)
rent_default
Number of tenants failed to pay rent last month
non_paid_rent
Non-paid rent (KES)
percent_rent
Percentage of total income from this property's rental
rent_collr
Who collects rent for the compound
pay_collr
Payment for rent collector
rent_collr_pay_num
Payment for rent collector (KES)
elec_grid
Compound is connected to electricity grid
elec_work
Connection is in working condition
pay_elec
How electricity is paid
av_elec_bill_num
Monthly electricity bill (KES)
pipe_water
Compound is connected to piped water
wat_work
Water connection is in working condition
pay_water
Water is paid for the entire compound
last_wat_bill_num
Water bill last month (KES)
av_wat_bill_num
Average water bill per month (KES)
total_expend_num
Average total monthly maintenance expenditure (KES)
con_to_sew
Will connect to sewerage system when available
num_toil
Number of toilet facilities (rooms)
sept_pit
Number of pits or septic tanks
pay_exhaust
Service payments for waste removal
freq_exhaust
Number of times per year for waste removal
last_exh_cost_num
Payment for waste removal
whole
Willing to pay Ksh 600/- monthly for connection and upgrade
eighty_three_perc
Willing to pay Ksh 500/- monthly for connection and upgrade
three_quart
Willing to pay Ksh 400/- monthly for connection and upgrade
a_half
Willing to pay Ksh 300/- monthly for connection and upgrade
a_third
Willing to pay Ksh 200/- monthly for connection and upgrade
a_sixth
Willing to pay Ksh 100/- monthly for connection and upgrade
a_tenth
Willing to pay Ksh 60/- monthly for connection and upgrade
speak_member
Frequency of communication with tenants
moved_tenant
Number of paying tenants that moved out in the last 12 months
long_years
Average time tenants stay: Years
long_months
Average time tenants stay: Months
rent_on_time
Tenants pay their rent on time
good_cond
Tenants keep the compound in a good condition
improv_cmpd
Tenants request improvements in the compound
cond_of_cpd
Tenants complain about conditions in the compound
oth_props_own
Number of properties owned
no_of_props
Number of properties receive rental income
tot_rent_inc_1
Total rental income last month (KES)
perc_inc_rent
Percentage of total income came from rental income
owner_doc_1
Ownership documents: Title deed
owner_doc_2
Ownership documents: Municipal (allotment) letter
owner_doc_3
Ownership documents: Letter from the chief
owner_doc_4
Ownership documents: No documentation
will_connect_1
Reason will connect: Cheaper in the long run
will_connect_2
Reason will connect: Healthier environment for tenants
will_connect_3
Reason will connect: Better convenience for tenants
will_connect_4
Reason will connect: Requirement by County Government
will_connect_5
Reason will connect: Only available option
will_connect_6
Reason will connect: Better rental income
will_connect_7
Reason will connect: Attract better tenants
will_connect_8
Reason will connect: Reduce tenant turnover rates
will_connect_9
Reason will connect: Increase value of compound
not_connect_1
Reason will not connect: Cannot afford the upfront costs
not_connect_2
Reason will not connect: Not worth the additional costs
not_connect_3
Reason will not connect: Current facilities are sufficient
not_connect_4
Reason will not connect: Connection will be of poor quality
not_connect_5
Reason will not connect: Connection will take too long to receive
not_connect_6
Reason will not connect: Do not trust the water and sewerage company
not_connect_7
Reason will not connect: Maintenance will be too costly
not_connect_8
Reason will not connect: Connection will be of poor quality
current_toilet_1
Current toilet: Flush toilet
current_toilet_2
Current toilet: Pour flush
current_toilet_3
Current toilet: Ventilated improved pit latrine
current_toilet_4
Current toilet: Pit latrine with slab
current_toilet_5
Current toilet: Composting toilet
current_toilet_6
Current toilet: Pit latrine without slab / open pit
current_toilet_7
Current toilet: Bucket
current_toilet_8
Current toilet: Hanging toilet / hanging latrine
current_toilet_9
Current toilet: Plastic bag system (flying toilet)
current_toilet_10
Current toilet: Peepoo
current_toilet_11
Current toilet: No Facility
Total: 98
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.