The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • Collections
  • Citations
  • Terms of use
  • About
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / NIC_2006_ES_V01_M_WB / variable [F1]
enterprise_surveys

Enterprise Survey 2006

Nicaragua, 2006
Get Microdata
Reference ID
NIC_2006_ES_v01_M_WB
DOI
https://doi.org/10.48529/2zcd-8x52
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
DDI/XML JSON
Created on
Mar 24, 2011
Last modified
Sep 26, 2013
Page views
28574
Downloads
2649
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Nicaragua-2006--full
    data-1

applied to obtain an electrical connection submitted over the last two years? (c3)

Data file: Nicaragua-2006--full data-1

Overview

Valid: 478
Invalid: 0
Type: Discrete
Decimal: 0
Start: 174
End: 175
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Question pretext
READ THE FOLLOWING TO THE RESPONDENT BEFORE PROCEEDING: The next theme is the infrastructure
Literal question
Over the last two years, did this establishment submit an application to obtain an electrical connection?
Categories
Value Category Cases
-9 don't know 0
0%
1 yes 132
27.6%
2 no 346
72.4%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Application for electrical connection.
Electrical connection refers to a new connection or to an increase in voltage of an existing connection that requires an application.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.