The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • Collections
  • Citations
  • Terms of use
  • About
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / NIC_2006_ES_V01_M_WB / variable [F1]
enterprise_surveys

Enterprise Survey 2006

Nicaragua, 2006
Get Microdata
Reference ID
NIC_2006_ES_v01_M_WB
DOI
https://doi.org/10.48529/2zcd-8x52
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
DDI/XML JSON
Created on
Mar 24, 2011
Last modified
Sep 26, 2013
Page views
28396
Downloads
2648
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Nicaragua-2006--full
    data-1

informal gift/payment expected or requested for an electrical connection? (c5)

Data file: Nicaragua-2006--full data-1

Overview

Valid: 132
Invalid: 346
Type: Discrete
Decimal: 0
Start: 179
End: 180
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
In reference to that application for an electrical connection, was an informal gift or payment expected or requested?
Categories
Value Category Cases
-9 don't know 1
0.8%
-8 refusal 1
0.8%
1 yes 11
8.3%
2 no 119
90.2%
Sysmiss 346
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
1) Bribe for electrical connection. Self-explanatory
2) Sensitive question, no clarification can be offered
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.