The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / IND_2014_ES_V01_M / variable [F2]
enterprise_surveys

Enterprise Survey 2014

India, 2013 - 2014
Get Microdata
Reference ID
IND_2014_ES_v01_M
DOI
https://doi.org/10.48529/kqgv-2v89
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Feb 12, 2015
Last modified
Oct 08, 2015
Page views
84271
Downloads
29279
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • india_2014_full_data_

When You Applied For A Water Connection, Was An Informal Gift/payment Requested? (c14)

Data file: india_2014_full_data_

Overview

Valid: 95
Invalid: 9186
Type: Discrete
Decimal: 0
Start: 167
End: 168
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, was an informal gift or payment expected or requested?
Categories
Value Category Cases
-9 DON'T KNOW (SPONTANEOUS) 9
9.5%
-8 REFUSE (SPONTANENOUS) 6
6.3%
1 Yes 27
28.4%
2 No 53
55.8%
Sysmiss 9186
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
1) Bribe for water connection. Self-explanatory
2) Sensitive question, no clarification can be offered.

Others

Notes
C14 In reference to that application for a water connection, was an informal gift or payment expected or requested
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.