The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • Collections
  • Terms of use
  • About
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / SUR_2018_ES_V01_M / variable [F2]
enterprise_surveys

Enterprise Survey 2018

Suriname, 2018 - 2019
Get Microdata
Reference ID
SUR_2018_ES_v01_M
Producer(s)
World Bank Group (WBG)
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Feb 04, 2020
Last modified
Feb 04, 2020
Page views
7737
Downloads
224
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • suriname_2018_full_data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: suriname_2018_full_data.dta

Overview

Valid: 18
Invalid: 215
Minimum: -6
Maximum: 700
Type: Discrete
Decimal: 0
Width: 3
Range: -6 - 700
Format: Numeric

Questions and instructions

Literal question
C.13 In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 1
0.4%
-5 Application denied 0
0%
1 One day or less 0
0%
4 1
0.4%
7 2
0.9%
14 3
1.3%
21 1
0.4%
60 3
1.3%
90 2
0.9%
150 1
0.4%
180 1
0.4%
365 2
0.9%
700 1
0.4%
Sysmiss 215
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.