The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • Collections
  • Citations
  • Terms of use
  • About
  • Login
    Login
    Home / Central Data Catalog / IMPACT_EVALUATION / RWA_2015-2018_LWHIE_V01_M / variable [F1]
impact_evaluation

Impact, Maintenance, and Sustainability of Irrigation Impact Evaluation Survey 2015-2018, Baseline, First, Second, Third Follow-up

Rwanda, 2015 - 2018
Get Microdata
Reference ID
RWA_2015-2018_LWHIE_v01_M
DOI
https://doi.org/10.48529/899t-y944
Producer(s)
Florence Kondylis, Maria Jones, John Loeser, Jeremy Magruder
Collection(s)
Impact Evaluation Surveys Development Impact Evaluation (DIME)
Metadata
Documentation in PDF DDI/XML JSON
Created on
Feb 27, 2020
Last modified
Mar 03, 2020
Page views
248251
Downloads
1150
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • bl_hh_modules.dta
  • bl_hh_roster.dta
  • bl_parcel_plot_roster.dta
  • bl_rw_hh_modules.dta
  • bl_rw_hh_roster.dta
  • bl_rw_parcel_plot_roster.dta
  • bl_rw_season_17a.dta
  • bl_rw_season_17b.dta
  • bl_rw_season_17c.dta
  • bl_season_14c.dta
  • bl_season_15a.dta
  • bl_season_15b.dta
  • fup1_hh_modules.dta
  • fup1_hh_roster.dta
  • fup1_parcel_plot_roster.dta
  • fup1_rw_hh_modules.dta
  • fup1_rw_hh_roster.dta
  • fup1_rw_parcel_plot_roster.dta
  • fup1_rw_season_18a.dta
  • fup1_rw_season_18b.dta
  • fup1_rw_season_18c.dta
  • fup1_rw_season_19a.dta
  • fup1_season_16b.dta
  • fup1_season_16c.dta
  • fup1_season_17a.dta
  • fup2_hh_modules.dta
  • fup2_hh_roster.dta
  • fup2_parcel_plot_roster.dta
  • fup2_season_17b.dta
  • fup2_season_17c.dta
  • fup3_hh_modules.dta
  • fup3_hh_roster.dta
  • fup3_parcel_plot_roster.dta
  • fup3_season_18a.dta
  • fup3_season_18b.dta
  • fup3_season_18c.dta
  • fup3_season_19a.dta

IG_11 What kinds of maintenance does the Irrigation System need? ENUMERATOR: DO (ig_11_9)

Data file: bl_hh_modules.dta

Overview

Valid: -
Invalid: 1695
Maximum: *
Type: Discrete
Decimal: 0
Start: 92
End: 93
Width: 2
Range: - *
Format: Numeric

Questions and instructions

Categories
Value Category
1 Removal of Silt/Vegetation from the Main Canal
2 Repair/Replacement of Masonry
3 Rehabilitation of Embankment along canal
4 Repair/Replacement of secondary valve handles
5 Secondary Pipe Flushed of Sediment
6 Rehabilitation of Irrigation Ditch
7 Repair of Eroded Checkdam
8 Repair/Replacement of Tertiary Valve handles
9 Rehabilitation of Primary Drainage Canal
10 Rehabilitation of other drainage canals
11 Other Secondary Pipe Damage
12 Repair of Secondary Valve
13 None
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.