The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / IMPACT_EVALUATION / NGA_2014_TDPITCIE-BL_V01_M / variable [V490]
impact_evaluation

Teacher Development Programme In-Service Training Component Impact Evaluation 2014, Baseline Survey

Nigeria, 2014 - 2015
Get Microdata
Reference ID
NGA_2014_TDPITCIE-BL_v01_M
DOI
https://doi.org/10.48529/nmhk-av58
Producer(s)
Oxford Policy Management Ltd
Collection(s)
Impact Evaluation Surveys Fragility, Conflict and Violence
Metadata
Documentation in PDF DDI/XML JSON
Created on
Sep 06, 2016
Last modified
Sep 08, 2016
Page views
298619
Downloads
92333
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • bl_v2_1_ht
  • bl_v2_1_ti
  • bl_v2_1_htt_all
  • bl_v2_1_htt_tch
  • bl_v2_1_lo
  • bl_v2_1_tdna
  • bl_v2_1_pt

ModF HT68: Other - Specify (ht68_oth)

Data file: bl_v2_1_ht

Overview

Valid: 126
Invalid: 0
Type: Discrete
Start: 1588
End: 1617
Width: 30
Range: -
Format: character

Questions and instructions

Categories
Value Category Cases
Addition of classrooms 1
0.8%
Additional classes needed 1
0.8%
Additional Blocks 1
0.8%
Additional block ,Electric and 1
0.8%
Additional block and pens 1
0.8%
Additional block of classroom. 1
0.8%
Additional block of classrooms 1
0.8%
Additional building and staffr 1
0.8%
Additional classes,school fenc 1
0.8%
Additional classroom, Staff ro 1
0.8%
Additional classrooms 1
0.8%
Additional classrooms required 1
0.8%
Additional classrooms seriousl 1
0.8%
Additional classrooms, renovat 1
0.8%
Additional classrooms. 1
0.8%
Black Board 1
0.8%
Blackboard 1
0.8%
Blackboard,Tables 1
0.8%
Block of classes and water fac 1
0.8%
Chairs 1
0.8%
Chairs and water shortage 1
0.8%
Classroom floor 1
0.8%
Classroom flooring, soil erosi 1
0.8%
Classrooms 1
0.8%
Completion of 1 block classroo 1
0.8%
Completion of 1 block construc 1
0.8%
Doors, and Black board. 1
0.8%
Drainage 1
0.8%
Drainage in the school. 1
0.8%
Drainage, teaching material, f 1
0.8%
Fencing 1
0.8%
Floor 1
0.8%
Flooring 2
1.6%
Flooring and blackboards 1
0.8%
Flooring, painting 1
0.8%
Furniture 1
0.8%
Furniture. 2
1.6%
Furnitures 2
1.6%
Generator 1
0.8%
More blocks of classrooms and 1
0.8%
More classes and teachers 1
0.8%
More classrooms as raining sea 1
0.8%
Need School library, furnitur 1
0.8%
Need additional classes 2
1.6%
Need additional classrooms. 1
0.8%
Need extra classes. 1
0.8%
Need more classrooms, as pupi 1
0.8%
Needs additional blocks and sa 1
0.8%
No Furniture both pupils and t 1
0.8%
No enough toilets in that the 1
0.8%
PROVISION of Staffroom,fencing 1
0.8%
Provision of instructional mat 1
0.8%
Provision of water 1
0.8%
Pupils chairs 1
0.8%
Renovating the schools 1
0.8%
Renovation 1
0.8%
Renovation of block of 2 class 1
0.8%
Renovation of c!assrooms 1
0.8%
Renovation of one block of two 1
0.8%
Require additional classrooms 1
0.8%
School fencing. 1
0.8%
Seats 2
1.6%
Staff Quarters renovation. 1
0.8%
Staff house 1
0.8%
The School need fence 1
0.8%
The school need extra classes 1
0.8%
Toilets 1
0.8%
Toilets, Provision of water. 1
0.8%
Water facilities 1
0.8%
Water shortage and school furn 1
0.8%
Water supply 2
1.6%
additional borehole 1
0.8%
additional classroom 1
0.8%
additional classroom blocks 1
0.8%
additional classroom, 1
0.8%
additional classroom, blackboa 1
0.8%
additional classroom, pupils s 1
0.8%
additional classrooms even tem 1
0.8%
bats in classes which prevent 1
0.8%
bats problems 1
0.8%
black board 1
0.8%
borehole 1
0.8%
broken chairs 1
0.8%
carodor 1
0.8%
chairs 1
0.8%
chairs and desk 1
0.8%
chairs repairs 1
0.8%
classroom sittings, black boar 1
0.8%
classrooms and teachers houses 1
0.8%
construction of sunblock,class 1
0.8%
cracks and blackboards 1
0.8%
desk and water 1
0.8%
doors repairs, floorings 1
0.8%
electricity, computer set 1
0.8%
fence 1
0.8%
first aid box 1
0.8%
floor 1
0.8%
flooring 3
2.4%
flooring and general rehabilit 1
0.8%
flooring and painting 1
0.8%
flooring works 1
0.8%
floors 1
0.8%
furniture 1
0.8%
furnitures 1
0.8%
needs pupils sits. 1
0.8%
provision of water, access roa 1
0.8%
pupils furniture 1
0.8%
reconstruction of the whole sc 1
0.8%
renovation of classrooms 1
0.8%
repair of broken chairs 1
0.8%
sand filling of school premise 1
0.8%
school furniture 1
0.8%
seats 1
0.8%
tables and seats, a block of c 1
0.8%
total rehabilitation 1
0.8%
water source and accommodation 1
0.8%
water supply 1
0.8%
water,additional classes,table 1
0.8%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.