The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / NIC_2016_ES_V01_M / variable [F2]
enterprise_surveys

Enterprise Survey 2016

Nicaragua, 2016 - 2017
Get Microdata
Reference ID
NIC_2016_ES_v01_M
DOI
https://doi.org/10.48529/w61d-8a24
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Aug 25, 2017
Last modified
Aug 25, 2017
Page views
41002
Downloads
1560
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • nicaragua_2016_full_data

In Last Fy, What Was The Capacity Utilization (%) Of This Establishment? (f1)

Data file: nicaragua_2016_full_data

Overview

Valid: 110
Invalid: 223
Type: Discrete
Decimal: 0
Start: 1374
End: 1376
Width: 3
Range: -9 - 100
Format: Numeric

Questions and instructions

Literal question
In percentage terms, in fiscal year [insert last complete fiscal year], what was this establishment's output produced as a proportion of the maximum output possible if using all the resources available, that is to say capacity utilization?
Categories
Value Category Cases
-9 Don't know (spontaneous) 5
4.5%
5 1
0.9%
10 2
1.8%
15 1
0.9%
20 2
1.8%
30 2
1.8%
40 1
0.9%
45 1
0.9%
48 1
0.9%
50 3
2.7%
60 17
15.5%
64 1
0.9%
65 1
0.9%
70 10
9.1%
75 6
5.5%
80 16
14.5%
85 10
9.1%
90 13
11.8%
95 2
1.8%
98 2
1.8%
100 13
11.8%
Sysmiss 223
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
A capacity utilization estimate should be compared to a full production capacity capability. This question only references the production facility and not the administrative offices. Full production capacity is the maximum level of production that this establishment could reasonably expect to attain under normal and realistic operating conditions fully utilizing the machinery, equipment and employees in place
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.