The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • Collections
  • Citations
  • Terms of use
  • About
  • Login
    Login
    Home / Central Data Catalog / IMPACT_EVALUATION / MWI_2010_SIHRIE-R3_V01_M / variable [F29]
impact_evaluation

Schooling, Income, and Health Risk Impact Evaluation Household Survey 2010, Round 3 (Midline)

Malawi, 2010
Get Microdata
Reference ID
MWI_2010_SIHRIE-R3_v01_M
DOI
https://doi.org/10.48529/7w21-dj26
Producer(s)
Berk Ozler, Sarah Baird, Craig McIntosh, Ephraim Chirwa
Collection(s)
Impact Evaluation Surveys The Strategic Impact Evaluation Fund (SIEF)
Metadata
Documentation in PDF DDI/XML JSON
Created on
Sep 16, 2015
Last modified
Sep 16, 2015
Page views
113475
Downloads
2870
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Related citations
  • Data files
  • baseline_controls_public
  • SIHR3_PI_S1_public
  • SIHR3_PI_S2_public
  • SIHR3_PI_S3_public
  • SIHR3_PI_S4_public
  • SIHR3_PI_S5_public
  • SIHR3_PI_S6a_public
  • SIHR3_PI_S6b_public
  • SIHR3_PI_S6c_public
  • SIHR3_PI_S7_public
  • SIHR3_PI_S8_public
  • SIHR3_PII_S9A_public
  • SIHR3_PII_S9B_public
  • SIHR3_PII_S10A_public
  • SIHR3_PII_S10B_public
  • SIHR3_PII_S11A_public
  • SIHR3_PII_S11B_public
  • SIHR3_PII_S12_public
  • SIHR3_PII_S13A_public
  • SIHR3_PII_S13B_public
  • SIHR3_PII_S14_public
  • SIHR3_PII_S15A_public
  • SIHR3_PII_S15B_public
  • SIHR3_PII_S16_public
  • SIHR3_PII_S17A_public
  • SIHR3_PII_S17B_public
  • SIHR3_PII_S18_public
  • SIHR3_PII_S19_public
  • SIHR3_PII_S20A_public
  • SIHR3_PII_S20B_public
  • SIHR3_PII_S20C_public
  • SIHR3_PII_S21_public
  • SIHR_identifiers

600 MK for sure or a lottery between 2000 and 0 with 50% pro (s19q12)

Data file: SIHR3_PII_S19_public

Overview

Valid: 1919
Invalid: 1665
Type: Discrete
Decimal: 0
Start: 72
End: 72
Width: 1
Range: 1 - 9
Format: Numeric

Questions and instructions

Question pretext
Now I would like to ask you some questions about another hypothetical situation. In this situation you are asked to choose between a certain amount of money for sure versus a different amount of money with a 50% chance, meaning that half the time you would get it and half the time you would not.
Literal question
If you were to choose between having 600 MK for sure or a lottery that pays 2000 MK with 50% probability and 0 MK with 50% probability, which would you choose?
Categories
Value Category Cases
1 600 MK for sure 1540
80.3%
2 2000 MK with 50% 378
19.7%
9 Missing 1
0.1%
Sysmiss 1665
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.