The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • Collections
  • Citations
  • Terms of use
  • About
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / ECU_2017_ES_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2017

Ecuador, 2017
Get Microdata
Reference ID
ECU_2017_ES_v01_M
DOI
https://doi.org/10.48529/5xvb-w377
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Created on
Mar 06, 2018
Last modified
Mar 06, 2018
Page views
26768
Downloads
1585
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • ecuador_2017_full_data

Informal Gift/Payment Expected Or Requested For A Construction-Related Permit (g4)

Data file: ecuador_2017_full_data

Overview

Valid: 66
Invalid: 295
Type: Discrete
Decimal: 0
Start: 1521
End: 1522
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, was an informal gift or payment expected or requested?
Categories
Value Category Cases
-9 Don't know (spontaneous) 1
1.5%
-8 Refusal (spontaneous) 0
0%
1 Yes 4
6.1%
2 No 61
92.4%
Sysmiss 295
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Opinion based or sensitive
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.