Value | Category | Cases | |
---|---|---|---|
Additional securing of vessels | 1 |
0.9%
|
|
All electronics are packed away in secure facility, reinforced | 1 |
0.9%
|
|
BUILT RIVER WALLS FOR PROTECTION OF THE HOTEL | 1 |
0.9%
|
|
Back up staff. | 1 |
0.9%
|
|
Bar up windows. | 1 |
0.9%
|
|
Built retaining wall to protect one cottage from slippage | 1 |
0.9%
|
|
Built the buildings high above sea level to mitigate flood and hurricane | 1 |
0.9%
|
|
Close, board up the place, reinforce the doors and windows | 2 |
1.8%
|
|
Controlling water penetration by wind or rain | 1 |
0.9%
|
|
Designated Safe Barbour | 1 |
0.9%
|
|
Designated shelter zone | 1 |
0.9%
|
|
Designated workers to stay on the premises | 2 |
1.8%
|
|
Disconnection of utility infrastructure for marinas. The whole property would go into hurricane mode | 1 |
0.9%
|
|
E-commerce (online ordering) and deliveries. | 1 |
0.9%
|
|
Earth Quake, Hurricane and fire material building structure | 1 |
0.9%
|
|
Eco system based adaptation | 1 |
0.9%
|
|
Emergency training completed | 1 |
0.9%
|
|
Equipment to secure the boats during a storm | 1 |
0.9%
|
|
First aid kits, fire extinguisher | 1 |
0.9%
|
|
Going to shelter and available transport | 1 |
0.9%
|
|
Hurricane Shelter | 1 |
0.9%
|
|
Hurricane boards | 2 |
1.8%
|
|
Invested in backup communications i.e satelite phones & other electronic media | 1 |
0.9%
|
|
Keeping dry good stocked | 1 |
0.9%
|
|
Lock all the outdoor furniture inside in storage, we board up all the ground floor windows prior to hurricane season | 1 |
0.9%
|
|
Make preparations | 1 |
0.9%
|
|
Medidas de seguridad | 1 |
0.9%
|
|
Medidas de seguridad y protección | 1 |
0.9%
|
|
Medidas para huracán | 1 |
0.9%
|
|
Medidas preventivas de la empresa | 1 |
0.9%
|
|
Medidas preventivas de seguridad | 1 |
0.9%
|
|
Muster points and staff training | 1 |
0.9%
|
|
Nail down Windows and doors with ply board | 1 |
0.9%
|
|
Planted lots of bamboo trees to assist with soil conservation | 1 |
0.9%
|
|
Ply wood boarding | 2 |
1.8%
|
|
Pray | 1 |
0.9%
|
|
Pruning of trees, fire extinguishers | 1 |
0.9%
|
|
Pumps | 19 |
17.4%
|
|
Pumps, airconditioners are up so they cannot be blown away or washed away | 2 |
1.8%
|
|
Put cars in indoor garage and arrange with hotels | 2 |
1.8%
|
|
Raised perimeter walls | 1 |
0.9%
|
|
Raised the wall close to the canal to ensure if canal level rises during a flood the watrer would not overflow on to the premises | 1 |
0.9%
|
|
Remove business structure from the sea by using a crane. | 1 |
0.9%
|
|
Remove canvases from the property. Trim trees. | 1 |
0.9%
|
|
Remove signs | 1 |
0.9%
|
|
Renovate the apartments continually. | 1 |
0.9%
|
|
Retaining Wall, Diversion of water | 1 |
0.9%
|
|
Secondary sites for guests | 1 |
0.9%
|
|
Securing high risk areas. If guest in on property, they would be encouraged to leave the island.a | 1 |
0.9%
|
|
Seguridad de riesgo en la empresa | 1 |
0.9%
|
|
Seguros privados Reservas | 1 |
0.9%
|
|
Self-sufficient, water production. | 1 |
0.9%
|
|
Staff training and muster point | 1 |
0.9%
|
|
Storage animal food | 2 |
1.8%
|
|
Technological measures | 2 |
1.8%
|
|
Towing boats into marina for safety. | 1 |
0.9%
|
|
Training | 1 |
0.9%
|
|
Training in fire and emergency response | 1 |
0.9%
|
|
Training of staff | 1 |
0.9%
|
|
Training off staff for any disaster occurring | 1 |
0.9%
|
|
Transfer of vehicles to safer location | 1 |
0.9%
|
|
Tree planting | 1 |
0.9%
|
|
Try to keep everybody indoors and board the place windows and doors | 2 |
1.8%
|
|
Try to safe guard the cars to get parking from a hotel parking or anywhere that rents parking space | 1 |
0.9%
|
|
Water pump | 1 |
0.9%
|
|
Water pumps | 1 |
0.9%
|
|
We built strong and higher than other buildings | 1 |
0.9%
|
|
We board up when a hurricane is approaching and we secure our cars | 2 |
1.8%
|
|
Will a just accordingly | 1 |
0.9%
|
|
back up lights incase of anything. | 1 |
0.9%
|
|
built a bunker for hurricane shelter | 1 |
0.9%
|
|
built additional river walls to protect hot spa pools | 1 |
0.9%
|
|
disaster awareness posters advertised | 1 |
0.9%
|
|
iCloud back up of company data | 1 |
0.9%
|
|
replace all possible signage and equipment to storage | 2 |
1.8%
|
|
replaced galvanize roof with concrete | 1 |
0.9%
|
|
stocking food and water | 2 |
1.8%
|
|
straps put on windows | 1 |
0.9%
|
|
training of staff | 1 |
0.9%
|
This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.