The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / IMPACT_EVALUATION / NPL_2013-2016_SSNP-RCT_V01_M / variable [F76]
impact_evaluation

Baseline, Midline, Endline and Follow-up Surveys on Community Challenge Fund, 2013-2016
The Role of Information and Cash Transfers on Early Childhood Development

Nepal, 2013 - 2016
Get Microdata
Reference ID
NPL_2013-2016_SSNP-RCT_v01_M
Producer(s)
Levere, Michael, Gayatri Acharya, Prashant Bharadwaj
Collection(s)
Impact Evaluation Surveys
Metadata
Documentation in PDF DDI/XML JSON
Created on
Oct 27, 2022
Last modified
Nov 22, 2022
Page views
90408
Downloads
2067
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • cosampling
  • SEC01
  • SEC02
  • SEC03
  • SEC04A
  • SEC04B
  • SEC04C
  • SEC05A
  • SEC05B1
  • SEC05B2
  • SEC05C
  • SEC05D
  • SEC06A
  • SEC06B
  • SEC07A
  • SEC07B
  • SEC07C
  • SEC07D
  • SEC07E
  • SEC07F
  • SEC08A
  • SEC08B
  • SEC08C
  • SEC09A
  • SEC09B
  • SEC09C
  • SEC09D
  • SEC09E
  • SEC09F
  • SEC09G
  • SEC09H
  • SEC09I
  • SEC10A
  • SEC10B
  • SEC11
  • wave1_vdcs
  • SEC00
  • SEC01
  • SEC02
  • SEC03
  • SEC04A
  • SEC04B
  • SEC04C
  • SEC05A
  • SEC05B1
  • SEC05B2
  • SEC05C
  • SEC05D
  • SEC06A
  • SEC06B
  • SEC07A
  • SEC07B
  • SEC07C
  • SEC07D
  • SEC07E
  • SEC07F
  • SEC08A
  • SEC08B
  • SEC08C
  • SEC09A
  • SEC09B
  • SEC09C
  • SEC09D
  • SEC09E
  • SEC09F
  • SEC09G
  • SEC09H
  • SEC09I
  • SEC10A
  • SEC10B
  • SEC11
  • SEC00
  • SEC01
  • SEC02
  • SEC03
  • SEC04A
  • SEC04B
  • SEC04C
  • SEC05A
  • SEC05B1
  • SEC05B2
  • SEC05C
  • SEC05D
  • SEC06A
  • SEC06B
  • SEC07A
  • SEC07B
  • SEC07C
  • SEC07D
  • SEC07E
  • SEC07F
  • SEC08A
  • SEC08B
  • SEC08C
  • SEC09A
  • SEC09B
  • SEC09C
  • SEC09D
  • SEC09E
  • SEC09F
  • SEC09G
  • SEC09H
  • SEC09I
  • SEC10A
  • SEC10B
  • SEC11
  • SEC00
  • SEC01
  • SEC02
  • SEC03
  • SEC04A
  • SEC04B
  • SEC04C
  • SEC05A
  • SEC05B1
  • SEC05B2
  • SEC05C
  • SEC05D
  • SEC06A
  • SEC06B
  • SEC07A
  • SEC07B
  • SEC07C
  • SEC07D
  • SEC07E
  • SEC07F
  • SEC08A
  • SEC08B
  • SEC08C
  • SEC09A
  • SEC09B
  • SEC09C
  • SEC09D
  • SEC09E
  • SEC09F
  • SEC09G
  • SEC09H
  • SEC09I
  • SEC10A
  • SEC10B
  • SEC11

407. What is the main construction material of the outside wall of the house? (q04_407)

Data file: SEC04A

Overview

Valid: 4108
Invalid: 138
Minimum: 1
Maximum: 8
Type: Discrete
Decimal: 0
Width: 37
Range: 1 - 8
Format: Numeric

Questions and instructions

Categories
Value Category Cases
1 Bamboo/Wood/Cement mix (centre wall) 146
3.4%
2 Cement bonded Stones/Bricks/Concrete 498
11.7%
3 Mud bonded Stones/Bricks 1145
27%
4 Wood 138
3.3%
5 Unbaked Bricks 31
0.7%
6 Bamboo and mud 1496
35.2%
7 Clay, Husk, Mud, Straw, Hay 652
15.4%
8 Other 2
0%
Sysmiss 138
3.3%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.